Build type: loft conversion
Project length: 10 weeks
Vivian wanted a master bedroom in the roof space of her home with an en-suite and study. The windows to the rear of the property were also updated as part of the project.
Build type: loft conversion and single-storey extension
Project length: 12 weeks
Denise wanted a Harvey Jones kitchen and needed to extend the ground floor to accommodate it. As part of the work, a utility room was created with an integrated shower. The loft conversion included two bedrooms and a shared shower room.
Build type: loft conversion
Project length: 10 weeks
Malcolm wanted a large bedroom with an en-suite in the loft space of his home. His neighbours were also after the same thing, so we carried out the work on both properties at the same time.