Build type: loft conversion
Project length: 6 weeks
Keith wanted to extend their existing Loft Conversion to add an en-suite bathroom. The dormer was created and the bathroom finished within 6 weeks from the commencement of works.
Build type: loft conversion renovation, roof terrace and roof repairs
Project length: 12 weeks
After nearly a decade of living in their Kensington and Chelsea terrace, Sue and Chris Harris thought it was about time they got around to updating their loft conversion.
Build type: loft conversion – bedroom with en suite, first-floor ceiling heights lowered and renovation of first-floor bedrooms.
Project length: 11 weeks
Nicola Harmer was one client who knew exactly what she wanted, right from the start. ‘We didn’t want anything grand,’ she said. ‘Just a bedroom with an en suite.’