Build type: rear and front extension, and garage conversion
Project length: 25 weeks
When Richard and Sarah Haywood bought their semi-detached home they always knew an extension was on the cards. The house’s dated and traditional style, with individual rooms for cooking, eating and relaxing, was not for them. ‘We wanted the main living space to be open-plan,’ said Richard.
Build type: refurbishment, loft conversion, side extension
Project length: 24 weeks
Initially, Paul wanted a small side extension to create a utility room and dining room and an extensive loft conversion to create two bedrooms with en-suite bathrooms. He then asked us to reconfigure and redecorate the entire property.
Build type: extension and refurbishment
Project length: 12 weeks
Hanneke wanted to transform the existing property by reconfiguring the space and adding an extension. The improved layout was then used to house a kitchen-diner, separate utility room, study and shower room.