Build type: loft conversion and double rear-storey extension
Project length: 24 weeks
Alan wanted to completely overhaul his property and extend it with a double-storey rear extension and a VELUX loft conversion with an en-suite steam room. The whole house was completely refurbished with new bathrooms and a new kitchen-diner.
Build type: single-storey extensions
Project length: 14 weeks
Gemma and Tom wanted to create an open-plan living space with a separate utility room and downstairs toilet. This tricky engineering project saw us support the first floor while the ground floor walls were removed to create the two extensions.
Build type: refurbishment, loft conversion, side extension
Project length: 16 weeks
The Victorian mid terrace property in Fulham had been untouched since the 1970s and required a complete overhaul. We added a small side in-fil extension and a mansard loft conversion and refurbished all the rooms within the property.