Build type: loft conversion and single-storey extension
Project length: 32 weeks
Raj wanted the whole house to be refurbished with a new roof, loft conversion, rear extension and three brand new bathrooms. The property was re-wired and a new heating system was installed.
Build type: single-storey extension
Project length: 12 weeks
Fran wanted to integrate their existing kitchen, dining and living spaces, for an open-plan layout and more sociable space. They wanted to ensure that the new design incorporated as much natural light as possible for a bright and airy feel.
Build type: refurbishment, loft conversion, side extension
Project length: 24 weeks
Initially, Paul wanted a small side extension to create a utility room and dining room and an extensive loft conversion to create two bedrooms with en-suite bathrooms. He then asked us to reconfigure and redecorate the entire property.