Build type: loft conversion and single-storey extension
Project length: 32 weeks
Raj wanted the whole house to be refurbished with a new roof, loft conversion, rear extension and three brand new bathrooms. The property was re-wired and a new heating system was installed.
Build type: extension
Project length: 20 weeks
Sarah wanted a spacious kitchen-diner and living room along with a complete refurbishment of the rest of her house. A new extension was constructed to the rear of the property to accommodate the new, larger living space and separate utility. We also remodelled the first floor to create an en suite for the master bedroom.
Build type: single-storey extension
Project length: 12 weeks
Fran wanted to integrate their existing kitchen, dining and living spaces, for an open-plan layout and more sociable space. They wanted to ensure that the new design incorporated as much natural light as possible for a bright and airy feel.